Need guidance for Migrating from 4507 to 6513.

From: sajid mavani <sajidmavani_at_gmail.com>
Date: Fri, 17 Apr 2009 10:36:17 +0530

Hi everyone,

I neede your suggestion.

I am doing a migration activity where there is one 4507 switch that would be
replace by two 6513 switch ( this is the hub location.)

Each of the 6513 switches has two sup engines.

I just wanted how could i get redundacny between the 2 sup engines of two
switches. I am configuring HSRP on the switches and making SW1 active &
switch 2 as Stanby.

What would be the physical conectivity between the sup ? and their
redundacny configurartion.

Please help me out as per your earliest Convinience.

Have a Pleasant day.

Regards

Sam

Blogs and organic groups at http://www.ccie.net
Received on Fri Apr 17 2009 - 10:36:17 ART

This archive was generated by hypermail 2.2.0 : Mon May 04 2009 - 07:39:12 ART