Re: Need guidance for Migrating from 4507 to 6513.

From: Colm O'Leary (co.oleary_at_gmail.com) <(co.oleary_at_gmail.com)>
Date: Fri, 17 Apr 2009 21:36:11 +1000

Mate,

You need to look at what you are trying to achieve:

1. Device Redundancy
2. Supervisor Redundacy
3. L3 Redundancy
4. L2 Redundancy

I would suggest you start at L2 and work up.

Colm

2009/4/17 sajid mavani <sajidmavani_at_gmail.com>

> Hi everyone,
>
> I neede your suggestion.
>
> I am doing a migration activity where there is one 4507 switch that would
> be
> replace by two 6513 switch ( this is the hub location.)
>
> Each of the 6513 switches has two sup engines.
>
> I just wanted how could i get redundacny between the 2 sup engines of two
> switches. I am configuring HSRP on the switches and making SW1 active &
> switch 2 as Stanby.
>
> What would be the physical conectivity between the sup ? and their
> redundacny configurartion.
>
> Please help me out as per your earliest Convinience.
>
> Have a Pleasant day.
>
> Regards
>
> Sam
>
>
> Blogs and organic groups at http://www.ccie.net
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html

Blogs and organic groups at http://www.ccie.net
Received on Fri Apr 17 2009 - 21:36:11 ART

This archive was generated by hypermail 2.2.0 : Mon May 04 2009 - 07:39:12 ART