Mate,
You need to look at what you are trying to achieve:
1. Device Redundancy
2. Supervisor Redundacy
3. L3 Redundancy
4. L2 Redundancy
I would suggest you start at L2 and work up.
Colm
2009/4/17 sajid mavani <sajidmavani_at_gmail.com>
> Hi everyone,
>
> I neede your suggestion.
>
> I am doing a migration activity where there is one 4507 switch that would
> be
> replace by two 6513 switch ( this is the hub location.)
>
> Each of the 6513 switches has two sup engines.
>
> I just wanted how could i get redundacny between the 2 sup engines of two
> switches. I am configuring HSRP on the switches and making SW1 active &
> switch 2 as Stanby.
>
> What would be the physical conectivity between the sup ? and their
> redundacny configurartion.
>
> Please help me out as per your earliest Convinience.
>
> Have a Pleasant day.
>
> Regards
>
> Sam
>
>
> Blogs and organic groups at http://www.ccie.net
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
Blogs and organic groups at http://www.ccie.net
Received on Fri Apr 17 2009 - 21:36:11 ART
This archive was generated by hypermail 2.2.0 : Mon May 04 2009 - 07:39:12 ART