INE W1 [IP Routing Task 3.5 - Backup Interface]

From: Bilal Hansrod <bilal.hansrod_at_gmail.com>
Date: Sun, 15 Aug 2010 00:57:38 +1000

Hello Guys,

I am working on INE W1 Task 3.5 where I am testing backup command. I have
GNS3 setup with four 3550 switch. I have configured backup interface on R4
frame relay interface to be P2P between R4 and R5. The issue is that, when I
shutdown physical interface on R5 and expecting PVC to go down on R4 frame
side, but the PVC still stays up. I manually shut down frame interface on R4
and the backup interface comes up and I can see on debugs. I am not sure,
but just thinking may be Frame switch on GNS3 doesn't send the updated PVC
to be deleted on R4. Does anyone encounter the same problem.

Any thougts-

Thanks in advance,

Bilal

Blogs and organic groups at http://www.ccie.net
Received on Sun Aug 15 2010 - 00:57:38 ART

This archive was generated by hypermail 2.2.0 : Wed Sep 01 2010 - 11:20:52 ART