If your computer can handle another router then create your own FR switch... If you ever have a question about something not working as it is supposed to and GNS3 is in the same sentence, move on!
On Aug 14, 2010, at 10:57 AM, Bilal Hansrod wrote:
> Hello Guys,
>
> I am working on INE W1 Task 3.5 where I am testing backup command. I have
> GNS3 setup with four 3550 switch. I have configured backup interface on R4
> frame relay interface to be P2P between R4 and R5. The issue is that, when I
> shutdown physical interface on R5 and expecting PVC to go down on R4 frame
> side, but the PVC still stays up. I manually shut down frame interface on R4
> and the backup interface comes up and I can see on debugs. I am not sure,
> but just thinking may be Frame switch on GNS3 doesn't send the updated PVC
> to be deleted on R4. Does anyone encounter the same problem.
>
> Any thougts-
>
> Thanks in advance,
>
> Bilal
>
>
> Blogs and organic groups at http://www.ccie.net
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
Blogs and organic groups at http://www.ccie.net
Received on Sat Aug 14 2010 - 11:07:43 ART
This archive was generated by hypermail 2.2.0 : Wed Sep 01 2010 - 11:20:52 ART