Thank you Sarad and Adrian - I think it is good idea to create a FR switch,
but I am bit scared to muck around with my GNS3. Yes, I specifically bought
i7 with 6G for lab.
Thanks again.
On Sun, Aug 15, 2010 at 1:07 AM, Adrian Brayton <abrayton_at_gmail.com> wrote:
> If your computer can handle another router then create your own FR
> switch... If you ever have a question about something not working as it is
> supposed to and GNS3 is in the same sentence, move on!
>
>
> On Aug 14, 2010, at 10:57 AM, Bilal Hansrod wrote:
>
> > Hello Guys,
> >
> > I am working on INE W1 Task 3.5 where I am testing backup command. I have
> > GNS3 setup with four 3550 switch. I have configured backup interface on
> R4
> > frame relay interface to be P2P between R4 and R5. The issue is that,
> when I
> > shutdown physical interface on R5 and expecting PVC to go down on R4
> frame
> > side, but the PVC still stays up. I manually shut down frame interface on
> R4
> > and the backup interface comes up and I can see on debugs. I am not sure,
> > but just thinking may be Frame switch on GNS3 doesn't send the updated
> PVC
> > to be deleted on R4. Does anyone encounter the same problem.
> >
> > Any thougts-
> >
> > Thanks in advance,
> >
> > Bilal
> >
> >
> > Blogs and organic groups at http://www.ccie.net
> >
> > _______________________________________________________________________
> > Subscription information may be found at:
> > http://www.groupstudy.com/list/CCIELab.html
Blogs and organic groups at http://www.ccie.net
Received on Sun Aug 15 2010 - 01:11:52 ART
This archive was generated by hypermail 2.2.0 : Wed Sep 01 2010 - 11:20:52 ART