From: Gregory Gombas (ggombas@gmail.com)
Date: Sat May 26 2007 - 20:12:13 ART
When doing the lab which diagrams do you recommend should be draw out
or copied from the lab diagrams? For instance should you draw out a
separate diagram for each of the following - Layer 2, IGP, BGP, IPv6
and multicast or do you normally consolidate?
I find it very time consuming to draw out separate diagrams for each
topology but when I try to consolidate the diagram it gets too
cluttered and confusing.
Also to what level of detail do you draw them in i.e. is it necessary
to copy all the IP addresses from the labs diagram or just refer to
the lab diagram when you need to?
I'm trying to find a balance between speed and utility.
Thanks,
Greg
This archive was generated by hypermail 2.1.4 : Fri Jun 01 2007 - 06:55:22 ART