Thank you, it is working now.
On 5/22/05, Ian Henderson <ianh@chime.net.au> wrote:
> On Sun, 22 May 2005, David Cearlock wrote:
>
> > controllers I see the below. However, the interfaces do not appear when using
> > the show interface command but all other interfaces do. Am I missing a step in
> > the installation process?
>
> You need to configure controller lines. For a point to point link, I use
> the following (T1 should be basically the same, perhaps adding some
> framing and linecode):
>
> controller E1 0/0
> channel-group 1 timeslots 1-31
>
> which creates Serial0/0:1, which I can then add frame/HDLC/PPP/whatever
> encapsulation.
>
> You can also configure 'pri-group' for ISDN, or 'tdm-group' for
> crossconnecting timeslots inside a chassis.
>
> Rgds,
>
>
>
> - I.
>
> --
> Ian Henderson CCNA, CCNP
> Senior Network Engineer
>
> iiNet Limited
> Chime Communications Pty Ltd
>
-- Thank you, David Cearlock MCSE - CCNP
This archive was generated by hypermail 2.1.4 : Fri Jun 03 2005 - 10:12:00 GMT-3