RE: NMC#2

From: Lee Donald (Lee.Donald@t-systems.co.uk)
Date: Wed Apr 20 2005 - 16:08:22 GMT-3


This must be manually configured using the channel-group command.

Regards

Lee.

-----Original Message-----
From: Dennis J. Hartmann [mailto:dennisjhartmann@hotmail.com]
Sent: Wednesday, April 20, 2005 7:13 PM
To: ccielab@groupstudy.com
Subject: NMC#2

    I'm having a hard time seeing the Cat1 to Cat2 connection in the NMC
scenario's diagram. Is this indicative of the CCIE lab in general (that
there may be a lab diagram with some connectivity that's not shown in the
diagram)?
 
    Also: In the NMC#2 scenario, there's a port-channel interface that maps
to the channel-group instances on Fa 0/13 and 0/14. In this scenario, both
the physical interfaces and the L2 port-channel interface has the following
commands:
 
sw tr enc dot1q
sw tr allowed vlan 10,20,30,40,50
sw mode trunk
 
    I would check it myself, but I don't have connectivity to equipment
today. My question is as follows:
 
    Is this port-channel to physical interface configuration mapping done
dynamically by the switch or must it be manually configured?
 
    Thanks.
 

Sincerely,

 

Dennis J. Hartmann

White Pine Communications

dh8@pobox.com

CCSI#23402/CCIP/CCNP/CCDP/CCNA/CCDA

Cisco IP Voice Support & Design Specialist

Cisco Optical, VPN & IDS Specialist

MCSE



This archive was generated by hypermail 2.1.4 : Tue May 03 2005 - 07:55:04 GMT-3