RE: Testing ISDN Backup interface

From: Gyo (Gabor.Gyori@xxxxxx)
Date: Mon Jul 08 2002 - 13:52:07 GMT-3


   
Shut down the other side, or change the encapsulation.

Gabor

> -----Original Message-----
> From: Ahmed Al-Ghawas [mailto:ghawas@batelco.com.bh]
> Sent: Monday, July 08, 2002 5:39 PM
> To: ccielab@groupstudy.com
> Subject: Testing ISDN Backup interface
>
>
> Guys,
>
> Do anyone of you know how I can test the ISDN backup
> interface command when
> applied on a HDLC physical serial interface without removing
> the physical
> cable? I know that you can shut down a sub-interface on a
> Frame Relay P2P or a
> Multilink and fire-up the backup interface. However, shutting
> down a serial
> line that is configured on a physical interface does not
> start the backup link
> as it will be administratively down.
>
> Thanks,
> Ahmed



This archive was generated by hypermail 2.1.4 : Sat Sep 07 2002 - 19:36:22 GMT-3