From: J. Tsao (johnnyt@xxxxxxxxxx)
Date: Mon Jul 08 2002 - 13:40:18 GMT-3
try shutting it from the frame switch... or the other side of the link...
-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com]On Behalf Of
Ahmed Al-Ghawas
Sent: Monday, July 08, 2002 8:39 AM
To: ccielab@groupstudy.com
Subject: Testing ISDN Backup interface
Guys,
Do anyone of you know how I can test the ISDN backup interface command when
applied on a HDLC physical serial interface without removing the physical
cable? I know that you can shut down a sub-interface on a Frame Relay P2P or
a
Multilink and fire-up the backup interface. However, shutting down a serial
line that is configured on a physical interface does not start the backup
link
as it will be administratively down.
Thanks,
Ahmed
This archive was generated by hypermail 2.1.4 : Sat Sep 07 2002 - 19:36:22 GMT-3