From: chwarren@xxxxxxx
Date: Mon Jul 08 2002 - 14:02:02 GMT-3
'shut' the other side....
>
> From: "Ahmed Al-Ghawas" <ghawas@batelco.com.bh>
> Date: 2002/07/08 Mon AM 11:39:08 EDT
> To: <ccielab@groupstudy.com>
> Subject: Testing ISDN Backup interface
>
> Guys,
>
> Do anyone of you know how I can test the ISDN backup interface command when
> applied on a HDLC physical serial interface without removing the physical
> cable? I know that you can shut down a sub-interface on a Frame Relay P2P or
a
> Multilink and fire-up the backup interface. However, shutting down a serial
> line that is configured on a physical interface does not start the backup lin
k
> as it will be administratively down.
>
> Thanks,
> Ahmed
This archive was generated by hypermail 2.1.4 : Sat Sep 07 2002 - 19:36:22 GMT-3