From: Brian Dennis (brian@xxxxxx)
Date: Mon Jul 08 2002 - 13:29:47 GMT-3
Shut down the end that isn't configured with the backup commands.
Brian
-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com] On Behalf Of
Ahmed Al-Ghawas
Sent: Monday, July 08, 2002 8:39 AM
To: ccielab@groupstudy.com
Subject: Testing ISDN Backup interface
Guys,
Do anyone of you know how I can test the ISDN backup interface command
when
applied on a HDLC physical serial interface without removing the
physical
cable? I know that you can shut down a sub-interface on a Frame Relay
P2P or a
Multilink and fire-up the backup interface. However, shutting down a
serial
line that is configured on a physical interface does not start the
backup link
as it will be administratively down.
Thanks,
Ahmed
This archive was generated by hypermail 2.1.4 : Sat Sep 07 2002 - 19:36:22 GMT-3