From: edgar feliz (ejfeliz65@xxxxxxxxx)
Date: Sun Mar 10 2002 - 00:48:53 GMT-3
The problem with mapping, unless it is required is that if you have alot of re
mote site going to a hub you have a lot of entrys to configure.
EF
Manny Gonzalez <gonzalu@nyp.org> wrote: Well, in using the PVC command (the n
ew format as it is called) you
still need to map layer 3 to the pvc
Int ATM3/0
pvc 0/500
protocol ip 1.2.3.4 broadcast
encapsulation aal5snap
You can also use inverse arp, although I highly recommend locking it in
with a mapping. I personally like the new way much better. it is very
intuitive and it is also a little more powerful/flexible in my opinion.
It is the only way to do ubr+ I believe.
Nirav Kumar wrote:
>
> hi !
> conventionally i have configured atm pvc config using
> the map-list/map-group commands ;
> reading the in 11.3.t ios doc , u may just use the pvc
> command ie:
>
> interface atm0.44 mulipoint
> pvc 0/44
>
> can anyone has any experience of using the pvc command
> as captioned above?
>
> would appreciate any feedback as to when is it
> suitable to use the map-group/map-list and when to we
> use the pvc commands.
>
> tia
>
> Nirav Kumar
>
This archive was generated by hypermail 2.1.4 : Thu Jun 13 2002 - 10:56:58 GMT-3