I am trying to do this and it never works.
R1======R2
R1 connected to R2 via S0/0 FR and s0/1 direct serial interface.
I configured Virtual template 1 on both routers, to run PPP over frame relay
and all is working fine, Both Links are up.
Virtual template is applied on the frame relay main interface.
Now I configure the Serial (s0/1) link as backup of FR link. As soon as i
shoudown the FR main interface, the backup (s0/1) is also shutdown and moved
to disabled state.
This problem can apparently be solved by applying the Virtual template on FR
point to point Subint.
Any reasoning?
Thanks!
-CC13
Blogs and organic groups at http://www.ccie.net
Received on Sun Apr 12 2009 - 22:59:47 ART
This archive was generated by hypermail 2.2.0 : Mon May 04 2009 - 07:39:11 ART