If you need L3, you can use separated links with equal cost load-balancing
Best regards,
Dan
On Sun, Apr 5, 2009 at 11:18 PM, Reza Toghraee <reza_at_toghraee.com> wrote:
> Hi group
>
>
>
> I'm trying to figure out the possibility of creating a single logical link
> between (2 Cat 6500 in VSS mode) and (2 Nexus switches) with 4 physical
> 10GB
> links between the 6500s and Nexus, in full mesh.
>
> 6500 supports MEC, and Nexus supports vPC, but I want to know is it
> possible
> to connect them together or not.
>
>
>
>
>
> Any ideas?
>
>
>
> Best Regards
>
> Reza Toghraee
>
>
> Blogs and organic groups at http://www.ccie.net
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
Blogs and organic groups at http://www.ccie.net
Received on Mon Apr 06 2009 - 08:34:55 ART
This archive was generated by hypermail 2.2.0 : Mon May 04 2009 - 07:39:11 ART