From: Omkar Tambalkar (omkar.groupstudy@gmail.com)
Date: Wed Nov 12 2008 - 05:49:22 ARST
Scenario?
If all trunk ports on the switch go down, configure the switch that port
f0/x goes in err-disable state. I had no idea about link state group and
tracking. When I read the question I went under the switchport and checked
the options and saw link as one of the configuration options, went thru the
DOCCD and read the details about the command. I thought that this command
will achieve what is needed but was not 100% sure, but I checked the
solution for that task, you had to configure all the trunk ports in a
upstream link state group and then track them....dang...
If this would have been the exam...I had no idea other than to ask the
proctor, but then I am pretty sure he will not give a straight yes/no answer
that yes you are right you need to link state group to obtain the results...
Another scenario in IGP configuration need IP SLA to be conifgured for
verifying connectivity to Frame Relay...I had no clue....I am SCARED!!
---Omkar
Blogs and organic groups at http://www.ccie.net
This archive was generated by hypermail 2.1.4 : Mon Dec 01 2008 - 08:18:30 ARST