From: Jonny English (redkidneybeans@gmail.com)
Date: Sun Oct 28 2007 - 16:25:12 ART
Look at the physical topology and then draw the diagram out in the tech lab.
See how everything is connected up physically and use an SVI to get
reachability. Then you will be able to use the tech labs for the technology
your doing.
I would say start with the switching tasks and if you don't have 4 switches,
rent some rack time and get this sorted first. Everything else will fall in
place.
On 10/29/07, Steven Hodgson <steveaggie@gmail.com> wrote:
>
> I have searched the archives, but can't find the answer to this question.
>
>
>
> I am just starting my studies and am using IEWB Vol 1 v4.1. Some of the
> lab
> questions show equipment to be directly connected but in the lab topology
> diagram they are not directly connected. This has me scratching my head
> as
> I thought the topology never changes. Can someone help shed some light on
> what I'm doing wrong?
>
>
>
> Thanks
>
> Steve
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
This archive was generated by hypermail 2.1.4 : Fri Nov 16 2007 - 13:11:19 ART