From: slevin kremera (slevin.kremera@gmail.com)
Date: Sat Sep 29 2007 - 21:57:31 ART
There is a mst configuration between sw1-sw2-sw3 and there are 2
instances.Also there is etherchannel pagp configured between these 3
instance 1 13-14-15
instance 2 16-17-18..........
i want instance 1 to take one etherchannel and instance 2 to take
other.Myconfusion is..shud i set spanning-tree mst 1 priorty 0 on sw1
and instance 2
priority 0 on switch 2
or
go to etherchannel 1 in sw1 and set instance 1 with lower priority
goto etherchannel 2 in sw1 and set instance 2 with lower priority
This archive was generated by hypermail 2.1.4 : Sat Oct 06 2007 - 12:01:17 ART