RE: IEWBv4 Lab1 1.2

From: Brian Dennis (bdennis@internetworkexpert.com)
Date: Tue Jan 16 2007 - 12:44:14 ART


Task 1.2 states to "ensure that other ports never become trunk ports".
This means the solution is really going to depend on what hardware you
did the lab with (four 3560s or three 3560s and one 3550). In the
latter case you could shutdown any extra inter-switch links connected to
the 3550 since they are in dynamic desirable mode. You could also
change the mode (either side) as opposed to shutting down the interface.
If using all 3560s nothing would need to be done since they are in
dynamic auto mode.
 
Brian Dennis, CCIE4 #2210 (R&S/ISP-Dial/Security/SP)
bdennis@internetworkexpert.com
 
Internetwork Expert, Inc.
http://www.InternetworkExpert.com
Toll Free: 877-224-8987
Direct: 775-745-6404 (Outside the US and Canada)

 

-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com] On Behalf Of
dampened
Sent: Tuesday, January 16, 2007 12:13 AM
To: Cisco certification
Subject: IEWBv4 Lab1 1.2

I did not find any thing on the question 1.2 that F0/21 between SW4 and
SW3
should be shutdown. However, the solution guilde have them shut. Is this
an
error?

Same go to links between SW1 and SW2. The connections between this two
switches are 2 x trunk (F0/13 and F0/15) and one access link (F0/14).
Is
this correct.