From: ccie2be (ccie2be@nyc.rr.com)
Date: Tue Jun 28 2005 - 15:09:53 GMT-3
Hi guys,
If ppp is configured in such a way that the 2bd channel can be brought up
based on the load of the 1st channel, it's possible to specify how long the
load threshold is exceeded before bringing up the 2nd channel.
For example, if I configure, ppp timeout multilink link add 30, the 2nd
channel will NOT be brought until the load is greater than the load
threshold for 30 seconds.
If desired, I could also specify how long after the load drops below the
load threshold for the 2nd channel to be dropped with, ppp timeout multilink
link remove 45.
Can I do the same if ppp isn't used? I looked for commands that do the same
thing but don't require ppp but couldn't find anything that fit the bill.
Do such commands not exist?
TIA, Tim
This archive was generated by hypermail 2.1.4 : Wed Jul 06 2005 - 14:43:45 GMT-3