From: loc.pham@comcast.net
Date: Fri Dec 31 2004 - 02:10:56 GMT-3
By using combination of :
ppp multilink load-threshold ( 60% of load )
and
ppp timeout multilink add 45
HTH,
LP
> Hey Guys:
>
> How can I configure one end of an ISDN link such that so that when the the first
> B channel reaches 60% within 45 seconds, the second B dials?
>
> akhen
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
This archive was generated by hypermail 2.1.4 : Mon Jan 03 2005 - 10:31:33 GMT-3