Hello:
I think this command has not got anything to do with the initial connection
initiation. As u say it can sometimes cause some confusion if the same is
configured both the ends. To configure bandwidth on demand by setting the
maximum load before the dialer places another call to a destination, use the
dialer load-threshold command in interface configuration mode.
Regards,
Noble
-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com]On Behalf Of
Dan Shechter
Sent: 20 July 2004 16:31
To: Group Study
Subject: Multilink - who should dial?
Hello all,
I have read somewhere that the 'dialer load-threshold' should be
configured only on one end, because both side might initiate the
connection in the same time and the call won't succeed.
Is it right?