From: KK FoK (rgb98a@xxxxxxxxxxx)
Date: Thu Nov 15 2001 - 05:59:41 GMT-3
Hi,
If the requirement is to bring up the second B channel when load is 40% (or
0.4*64=25.6K) or above, is 102 (0.4*255) correct ?
I suppose that when the second B channel is up then the aggregate bandwidth
is 128K. In that case at what loading will the second B channel be brought
down ??? (128*0.4=51.2 ???)
Your view please
This archive was generated by hypermail 2.1.4 : Fri Jun 21 2002 - 06:45:15 GMT-3