Hi All
What is the best design to connect dual CE routers to dual customer switches
in the most resilient/redundant design
The options I can think of are
1) a single L2 link down from each router to each switch with a L2 trunk
between switches, with HSRP running between routers
2) dual L3 links from each router
- from router 1 to switch 1 and from router 1 to switch 2
- from router 2 to switch 1 and from router 2 to switch 2
run IGP on these links and have a L2 trunk between the two switches.
Please can someone advise what is the best way of doing this for maximum
redundancy.
Kind Regards
Blogs and organic groups at http://www.ccie.net
Received on Mon Dec 27 2010 - 07:46:08 ART
This archive was generated by hypermail 2.2.0 : Sat Jan 01 2011 - 09:37:49 ART