Re: CCIE Lab Preparation using GNS3 - 4 switches against 2

From: Artem Nedoshepa <artem.nedoshepa_at_gmail.com>
Date: Sun, 12 Dec 2010 20:49:19 -0500

You got to have 4 switches, L2 is a very important part of the lab and you
want to be really comfortable with it.
4x3550 would be enough for 90% of the lab, the remaining 10% you can
practice on a ranted rack.

Use http://7200emu.hacki.at/ as your main source for dynamips+real
equipment source.
You can also check out my setup at ccie4you.info

On Sun, Dec 12, 2010 at 7:06 PM, Malik Nouman Ahmad <djmalik_at_gmail.com>wrote:

> Hi,
>
> All over internet it is a knows fact that to build up a CCIE Lab four
> switches (2x3550-24 ports & 2x3560-24 ports) are required
>
> I am still at the beginning of practicing different workbooks and have not
> that much details as to how will the switches be used. I was thinking that
> instead of buying 2 of each 3550 and 3560 switches with 24ports, if I buy 1
> of each switch model but with 48 ports. Will this be okay to do the labs as
> total port count is same or do we actually require for separate switches to
> perform the labs properly?
>
> Please clarify this confusion
>
> Thanks & best regards,
> Malik
>
>
> Blogs and organic groups at http://www.ccie.net
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html

Blogs and organic groups at http://www.ccie.net
Received on Sun Dec 12 2010 - 20:49:19 ART

This archive was generated by hypermail 2.2.0 : Sat Jan 01 2011 - 09:37:49 ART