I am not sure if we need to boot the master? I have these 3 switches stacked
together, where SW01 is the Master. SW01 : Stack 1 <--> Stack 2 : SW02SW02 :
Stack 1 <--> Stack 2 : SW05SW05 : Stack 1 <--> Stack 2 : SW02 Now, I want to
add SW06 to this stack SW01 : Stack 1 <--> Stack 2 : SW02SW02 : Stack 1 <-->
Stack 2 : SW05SW05 : Stack 1 <--> Stack 2 : SW06SW06 : Stack 1 <--> Stack 2 :
SW01 - Change the switch priority of SW06 to 1. switch 6 provision
ws-c3750g-48ps switch 6 priority 1 - Make sure that you redo the
connections, dis-connect and connect the stack cables SW06 : Stack 1 <-->
Stack 2 : SW01SW06 : Stack 2 <--> Stack 1 : SW05 - Power on the newly added
switch. Let me know if I am missing any steps here or I am doing something
wrong.
-Yuri
Blogs and organic groups at http://www.ccie.net
Received on Tue Nov 16 2010 - 14:48:35 ART
This archive was generated by hypermail 2.2.0 : Sun Dec 05 2010 - 22:14:56 ART