Hi Expert,
I am doing IE expert practice labs with GNS3 & came across a problem in
configuring fail over between a frame relay connections & a point to point
serial connections. Then I found out that even though I shut down the main
frame relay interface of a one router at the other end PVC status remain
active configuration of two routers are as follows,
Router 4 - Spoke router with PTP sub interface
Rack1R4#sh run int s0/0.1
Building configuration...
Current configuration : 115 bytes
!
interface Serial0/0.1 point-to-point
ip address 155.1.0.4 255.255.255.0
frame-relay interface-dlci 405
end
Rack1R4#sh run int s0/0
Building configuration...
Current configuration : 139 bytes
!
interface Serial0/0
no ip address
encapsulation frame-relay
clock rate 2000000
cdp enable
no frame-relay inverse-arp
end
Router 5 - Hub router
Rack1R5#sh run int s0/0
Building configuration...
Current configuration : 286 bytes
!
interface Serial0/0
ip address 155.1.0.5 255.255.255.0
encapsulation frame-relay
clock rate 2000000
cdp enable
frame-relay map ip 155.1.0.1 501
frame-relay map ip 155.1.0.2 502
frame-relay map ip 155.1.0.3 503
frame-relay map ip 155.1.0.4 504
no frame-relay inverse-arp
end
Wonder whether this is something to do with GNS3 or I am missing anything on
the configuration.
Thank you all in advance
Saranga
Blogs and organic groups at http://www.ccie.net
Received on Sat Feb 13 2010 - 11:42:14 ART
This archive was generated by hypermail 2.2.0 : Mon Mar 01 2010 - 06:28:35 ART