You are correct.
For troubleshooting be aware of what the PVC status is telling you from
the show frame pvc command.
Thanks
-- Larry Hadrava, Larryh_at_INE.com CCIE #12203 (R&S) Internetwork Expert, Inc. http://www.INE.com >----- Original Message ----- From: "belletjetrekken" <belletjetrekken_at_gmail.com> Sent: Fri, October 23, 2009 15:08 Subject:frame relay switch we don't have to configure the frame relay switch in the lab or do any troubleshooting of it or any cabling connected to it right ? thanks belletjetrekken Blogs and organic groups at http://www.ccie.netReceived on Fri Oct 23 2009 - 14:14:43 ART
This archive was generated by hypermail 2.2.0 : Sun Nov 01 2009 - 07:51:00 ART