From: gui-doo laduchesse (gui_doo@hotmail.com)
Date: Tue Jul 29 2008 - 11:04:12 ART
Hi,
On the lab 7, task 4.7 I was trying to make it work by using a Virtual-link
between R1 and R5 in area 1. After that I try to summarize the same way as in
R5. When I go to R3, I still see all the loopback specific route of R5 and R4.
I see that in the solution, the y state that we have to use a tunnel. I don't
get what the Virtual-Link as diffrent as the tunnel in area 0...
Thanks
Guillaume
This archive was generated by hypermail 2.1.4 : Mon Aug 04 2008 - 06:11:57 ART