RE: IEWB Lab 7 SW2 connection to R1 and R3

From: Steven Hodgson (steven.hodgson@inxi.com)
Date: Thu Jan 03 2008 - 11:14:38 ARST


Are you sure this is the task you meant?

1.4 Rate-Limiting
* Configure SW1 Fa1/5 to limit unicast traffic inbound to 25% of the
interfaces bandwidth
* Use the minimal configuration possible for this task

-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com] On Behalf Of
shiran guez
Sent: Thursday, January 03, 2008 1:09 AM
To: steveaggie@gmail.com
Cc: ccielab@groupstudy.com
Subject: Re: IEWB Lab 7 SW2 connection to R1 and R3

Task 1.4 on Lab 7 Guide you and tell you also how to do that.

On Jan 3, 2008 4:08 AM, <steveaggie@gmail.com> wrote:

> In Lab 7 it shows that SW2 has a layer 3 connection to R1 and R3.
> However,
> there are no tasks in the lab which as you to set this up. Since
these
> devices are not adjacent to each other, I assume that VLANs have to be
> created to trunk the traffic through the intermediate switch (SW1).
>
>
>
> Was this an oversight when they made it work with dynamips?
>
>
>
> Thanks
>
>



This archive was generated by hypermail 2.1.4 : Fri Feb 01 2008 - 10:37:57 ARST