RE: Catalyst 3750 stacking issue

From: Dennis Worth (Dennis.Worth@oomc.com)
Date: Fri Jun 03 2005 - 10:56:09 GMT-3


I found that the best solution is to manually set the priority of the
switches. A lot less headache's

Dennis Worth
Network Engineer
Option One Mortgage
phone. 949-790-3687
dennis.worth@oomc.com
-----Original Message-----
From: nobody@groupstudy.com [mailto:nobody@groupstudy.com] On Behalf Of
Loi, Choon Ho
Sent: June 02, 2005 11:48 PM
To: ccielab@groupstudy.com
Subject: Catalyst 3750 stacking issue

Hi,

If I stack 2 3750 together, and they got their stack number respectively
thru automatic election, will they carry the same stack number even a
power failure that causes a reboot to both switches?

Do I need to do a manual renumber to the stack number to maintain their
stack number?

Thanks.



This archive was generated by hypermail 2.1.4 : Wed Jul 06 2005 - 14:43:40 GMT-3