RE: ISDN SECOND B CHANNEL:

From: loc.pham@comcast.net
Date: Fri Dec 31 2004 - 12:40:46 GMT-3


  Interesting, one way is let test this simple requirement/ procedure .
   How can we simulate the 60 % load + 45 sec. and monitor the validity of this ?

  Thank you, LP

> Hi Guys,
>
> Don't forget to use the load-interval command, the question is to kick in
> the second B-channel if the load on the first B-channel is 60% within 45
> seconds. You have to configure load-interval 45 to compute load statistics
> on the interface every 45 seconds
>
> Link to load-interval.
>
> http://www.cisco.com/univercd/cc/td/doc/product/software/ios122/122cgcr/ffun
> _r/ffrprt3/frf012.htm#wp1018413
>
>
> Regards,
> Henk
>
> -----Oorspronkelijk bericht-----
> Van: nobody@groupstudy.com [mailto:nobody@groupstudy.com] Namens
> loc.pham@comcast.net
> Verzonden: vrijdag 31 december 2004 06:11
> Aan: Ralph; ccielab@groupstudy.com
> Onderwerp: Re: ISDN SECOND B CHANNEL:
>
> By using combination of :
> ppp multilink load-threshold ( 60% of load ) and ppp timeout multilink add
> 45
>
> HTH,
> LP
>
>
> > Hey Guys:
> >
> > How can I configure one end of an ISDN link such that so that when the the
> first
> > B channel reaches 60% within 45 seconds, the second B dials?
> >
> > akhen
> >
> > _______________________________________________________________________
> > Subscription information may be found at:
> > http://www.groupstudy.com/list/CCIELab.html
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html
>
> _______________________________________________________________________
> Subscription information may be found at:
> http://www.groupstudy.com/list/CCIELab.html



This archive was generated by hypermail 2.1.4 : Mon Jan 03 2005 - 10:31:33 GMT-3