From: Tom Young (gitsyoung@yahoo.co.jp)
Date: Thu Jun 03 2004 - 06:44:40 GMT-3
Hi, group
I have two question about STP.
1, I set the port cost as 2000 on one switch's interface ,
but it seems the cost couldn't be transfered to the
downstream switch, the downstream switch still use the
actual cost to calculate the STP. And show the
spanning-tree on the downstream switch , I won't see the
cost 2000 be added.
2, All the ports of root and secondary root are always
keep forwarding status in STP calculation , even change
the port cost to a bigger value, why ?
Thanks alot
This archive was generated by hypermail 2.1.4 : Sat Jul 03 2004 - 19:40:32 GMT-3