From: Darren Hosking (dhosking@commander.com)
Date: Fri Oct 24 2003 - 06:20:10 GMT-3
The sup1a-pfc is just a sup1a-2ge with a pfc daughter board factory installed (I believe). Is it possible to remove the PFC daughter board to turn the sup1a-pfc back into a sup1a-2ge?
Has anyone done this?
Are there any risks?
The data sheets say that the sup1a-2ge is NOT field upgradable so I'm concerned there may be some reason this can't be done (ie if you can't field install maybe you can't field un-install).
The reason I want to do this is to have redundant sup1a-2ge's and I already have the sup1a-pfc so it would be cheaper to remove the PFC. Alternatively, can the sup1a-pfc be a redundant supervisor for the sup1a-2ge with the PFC still installed?
Any advice appreciated.
Thanks, Darren
This archive was generated by hypermail 2.1.4 : Mon Nov 24 2003 - 07:53:07 GMT-3