Rép. : ISP/Dial Lab preparation

From: Thierry MARTIN (tmartin@xxxxxxx)
Date: Mon Jan 22 2001 - 10:50:52 GMT-3


   
Hi David,

I study for Lab R&S in february.

After March, i test all features of PIX and routers for CCIE SECURITY.

I have my POD with nine routers (IOS entreprise plus , FW, 56 bits) ;
PIX 520 with 6 interfaces LANs, and 2 switches ATM (not cisco) ;
some switches 2900XL and 3500 ; and a lot of servers (NT and Unix).

I am already doing configuration with AS 5300 and 3640 in NAS with digital mode
ms
and AAA (cisco secure ACS).

Best Regard

Thierry MARTIN
CCNA, CCDA, CCNP, specialization ATM & SECURITY

>>> "David C Prall" <dcp@dcptech.com> 22/01/01 14h23 >>>
Since, the Design lab is currently on hold. I decided to proceed with the
ISP/Dial Lab. Passed the written cold, received the email from the CCIE
program that I passed, and I've called to schedule my Lab. Now, where to
begin with studying.

I have an AS5200 in my possession, and I am pretty comfortable with the
basic configuration of 5200 and 5300 platforms. I have some experience with
the Access Path, so most of the MMP configuration I understand. I have an
Ultra Sparc 1 I can install Cisco Secure ACS for Unix on. I do not have a
PIX, but have configured the basics, using v5 code and the newer access-list
format instead of conduits.

I'd like to find a few people who are preparing for the lab, and start
brainstorming on these issues.

David C Prall dcp@dcptech.com http://dcp.dcptech.com
CCIE #6508 (Routing & Switching)
Design and ISP/Dial writtens passed



This archive was generated by hypermail 2.1.4 : Thu Jun 13 2002 - 10:27:38 GMT-3